REQUEST FOR EXPRESSION OF INTEREST FOR THE ELECTRICAL TESTING SERVICES OF
MCPYs (MAIN CAMPS AND PIPE YARDS) 5, 6, 7, 8, 9, 10
REFERENCE NO.: CPP-PROC-TZ-111-0711-C4
China Petroleum Pipeline Engineering Co., Ltd. (hereinafter abbreviated as CPP) as Pipeline, Feeder line & Main camps contractor for the East African Crude Oil Pipeline (EACOP) Project invites experienced and reputable Contractors to express their interest in providing electrical testing services works for the MCPY (Main Camps and Pipe Yards) 5 6, 7, 8, 9,10 to the EACOP Project.
The EACOP Project involves the construction and operation of an underground and cross-border pipeline to transport crude oil for export to international markets. The pipeline will run from Kabaale, Hoima District in Uganda to the Chongoleani peninsula near Tanga in Tanzania. The length of the pipeline is 1,443 km, of which 1,147 km will be in Tanzania.
BRIEF DESCRIPTION OF THE SCOPE OF THE SERVICES:
MCPY-5 (BULIFANI, KYAKA, MISSENYI, KAGERA)
MCPY-6 (KIGUZI, KARAMBI, MULEBA, KAGERA)
MCPY-7 (MKUNGO, BUKOMBE, CHATO, GEITA)
MCPY-8 (BUKOMBE, BUKOMBE, BUKOMBE, GEITA)
MCPY-9 (SOJO, IGUSULE, NZEGA, TABORA)
MCPY-10 (BULYANG’OMBE, NANGA, IGUNGA, TABORA)
MINIMUM REQUIREMENTS:
Companies or organizations expressing their interest are invited to document their request with:
Companies which have the ability, capacity, and resources to implement the activities listed above should express their interest by sending together with the documents stated in the above section through an email to biddingbox@cpptz.com (Max. Email Size: 20 MBs, all documents must be submitted in English language) on or before 24:00 hours East African Time (EAT), on 26th July 2024. The subject of the email should be “EOI for CPP-PROC-TZ-111-0711-C4-COMPANY NAME”. CPP reserves the right not to consider companies that submit an incorrect email subject and the incorrect format of Appendix 1, 2 and 3.
The format of the required documents and relevant technical requirements which are mentioned in Minimum Requirements should be dow nloaded from EACT)P’s website
( httDs://eaeoD.com/onnortunities-bv-main-construction-contractors/china-netroleum-pineline-en<jineering-eo-itd/).
Note: CPP will review’ and assess the documents provided by companies that have expressed interest in accordance with this EOI and conduct evaluations based on internal criteria to determine which companies will be included in the list of pre-qualified companies. Only the pre-qualified companies will receive, by signing a Non-Disclosure Agreement (NDA), an invitation to bid as a continuation of the call for tender process. CPP reserves the right at its sole discretion to make the decision to select or reject a company and maintain its decision.
Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.