Construction of 100 Cbm Biodigester Tender at Tanzania Human Development Foundation (tahude Foundation)
Website :
7 Days Ago
Linkedid Twitter Share on facebook
CALL FOR BIDDERS (CONSTRUCTION OF 100 CBM BIODIGESTER)
Tanzania Human Development Foundation (TAHUDE Foundation) and Scientists and Engineers Without Borders (SEWB, Korea) hereby invite
bidders for construction of one hundred cubic meters (100 cbm) biodigester for production of biogas using cow dung at Arusha Vocational Training
Center in Arusha, Tanzania. The construction activities must begin by 30th, September 2024 and be completed within 2 months.
The bidder should propose the price of each item including TAX as listed in the table below; the TOTAL should NOT exceed 165,350,000
Tanzanian Shilling including TAX. This project is sponsored by the Gyeonggi-do Province of the Republic of South Korea.
Since this project is government-to-government project between Korea and Tanzania, SAFETY is the top priority along the construction and during
the usage by school and households. All construction processes must follow safety rules and all hazards must be checked “multiple times” in every
part, in every process. Safety managers must be present during the construction and operation test period.
For further clarification and submission of the applicationplease kindlywrite to:hyeyoungenglish@gmail.com.The deadline for submission is 22d
September 2024.
The bidders should provide the following information:
1. Name of the company
9. Email
2. Registration number
10. Experience in construction of biodigesters
3. Date of Registration
11. Detailed company information (human resources,
4. Attachment of Business License
innovative components, construction and operational
5. TIN Number
experience, and so on)
6. Physical Address
12. Specific construction plan and full list of materials and
7. Name and position of the applicant
quantity to be used in each item
8. Phone number
13. Safety rules and plans on construction
[Selection Rule]
After a technical and price review, the company with the highest score is selected.
[Information about the construction]
(1)Village-type on-grid biogas plant construction project
(2)Target: Arusha Vocational Training Centre and 10 households nearby
(3)Average distance from the 100 ton digester to each place : 200 m
->Total 200mx 11=2,200m
->About 2,200-long pipeline would be needed, but exact and total length will be changeable depending on the site we select.
(4)10 ton main storage tank will be installed beside the digester.
[Expected Schedule]
(1)Bidding advertisement : 2024.09.09-2024.09.22
(2)Selection and Negotiation : 2024.09.23-2024.09.29
(3)Construction : 2 Months(2024.09.30 -2024.11.30)
(4)Official Operation Test : 2024.12.01 -2025.01.31
(5)A/S Period: 1 year after completion of construction
[Items List]
NO.
List
Quantity
100-ton Biogas system (Digester) with protective fences
10-ton main storage tank with protective fences
(It should be strong and safe)
Pipe distribution to 10 household and 1 school
(About total 2,200m-long pipe ; It can be changeable)
1
Cookstoves
Family size : 10
41)Family size : standatd double stove
2)For institution, 200 Liter size of pots and cookstoves should be offered
Institution size :
4
together.
Family size : 10
5Pressure gauge meters
Institution size : 1
Family size : 10
6Kitchen Top-ups
Institution size : 1
7Tricycle (GUTA)250 cc
[Important Note]
1All of the construction, labor, transport, official operation test fee, and all other additional fee should be included in the total construction fee.
(2)16 gas flow meters are provided by Gyeonggi Provincial Office, but installation of all of the gas flow meters must be performed by a
construction company and must be included in the total construction cost.
(3)Even if the total pipe length exceeds 2,200m, additional costs must be covered by the construction company.
(4)If construction is not completed within 2 months without prior agreement, the total construction cost will be reduced by 3% per day. However,
some extensions are possible upon prior agreement.
(5)During the Construction period of 2 months, testing the facilities multiple times and checking & solving safety issues thoroughly should be
included.
(6) The construction company should supervise and repair the problems during the 2 months of official operation test period since it’s directly related
to the safety.
(7) There should be 1 year of A/S period after the completion of construction.
(8) Measures must be taken to prevent theft during construction.
Scientists Engineers
Without Borders Korea
TAHUDE
VETA
FOUNDATION
Job Info
Job Category: Tenders in Tanzania
Job Type: Full-time
Deadline of this Job: Thursday, September 26 2024
Duty Station: Dar es Salaam
Posted: 12-09-2024
No of Jobs: 1
Start Publishing: 12-09-2024
Stop Publishing (Put date of 2030): 12-09-2066
Apply Now
Notification Board

Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.

Caution: Never Pay Money in a Recruitment Process.

Some smart scams can trick you into paying for Psychometric Tests.